CHANNEL A

ES-39(1)

The beginning of Open Channel A

The beginning of Open Channel A

The future width of Channel A

The future width of Channel A


This future width is assuming flood control maintains the current easements centerline, a 20 foot strip of the current dog park will go away.
Along with a portion of the sidewalk next to basketball courts

Along with a portion of the sidewalk next to basketball courts


The bridge will have to be replaced with a loss of the circle and planter

The bridge will have to be replaced with a loss of the circle and planter


Possibly a gazebo will be lost.

Possibly a gazebo will be lost.

P07-25-14_10.30
Top of bridge is currently 2 feet in depth, add and additional 4 feet for a total depth of 6 feet. (Each black tape mark is 1 foot)

2011 Future
The whited out area is approximately what will be lost from Regency Heritage Park when Channel A is completed.

Below pictures show what can happen when problems are reported and officials deal with them.

Taken 2 days before a storm, a full three months after the last storm.

Taken 2 days before a storm, a full three months after the last storm.


This was reported to City of Wildomar Operations Staff member Les Chapman who saw to it this was cleared up. The results are quite impressive.
Water can flow freely now.

Water can flow freely now.


Of course I have some criticism, They could have taken the debris to a dumpster before it flows back into the grate, but whatever we can get is good. Thank you Les.
This is one half of the debris which hopefully will be removed from the area.

This is one half of the debris which hopefully will be removed from the area.