This future width is assuming flood control maintains the current easements centerline, a 20 foot strip of the current dog park will go away.

Top of bridge is currently 2 feet in depth, add and additional 4 feet for a total depth of 6 feet. (Each black tape mark is 1 foot)
The whited out area is approximately what will be lost from Regency Heritage Park when Channel A is completed.
Below pictures show what can happen when problems are reported and officials deal with them.
This was reported to City of Wildomar Operations Staff member Les Chapman who saw to it this was cleared up. The results are quite impressive.
Of course I have some criticism, They could have taken the debris to a dumpster before it flows back into the grate, but whatever we can get is good. Thank you Les.